IRON GRIP STRENGTH Corner Gym TSA-9900 IMPEX INC. 14777 DON JULIAN RD., CITY OF INDUSTRY, CA 91746 Tel: (800) 999-8899 Fax: (626) 961-9966 ww
STEP 3 (See Diagram 3) A.) Slide fourteen Weight Plates (#54) onto the rear set of Guide Rods (#4). Make sure the groove on the plates all face to
STEP 4 (See Diagram 4) A.) Do not tighten all Nuts and Bolts in this step until instructed to do so. B.) Attach the Right Vertical Frame (#5) to t
STEP 5 (See Diagram 5) A.) Do not tighten all Nuts and Bolts in this step until instructed to do so. B.) Place the Upper Frame (#8) onto the Right V
STEP 6 (See Diagram 6) A.) Securely tighten all Nuts and Bolts previously installed. B.) Attach the Right Seat Support (#10) to the Right Base Fra
DIAGRAM 6 13
STEP 7 (See Diagram 7) A.) Attach the Left Seat Support (#11) to the Left Base Frame (#2). Secure it with one M10 x 2 ½” Carriage Bolt (#98), Ø ¾” Wa
STEP 8 (See Diagram 8) A.) Attach the Chin-up Support (#17) to the Power Station Vertical Frame (#7). Secure it with three M10x4” Allen Bolts (#100),
STEP 9 (See Diagram 9) A.) Insert the axle on the Right Butterfly (#15) through a Butterfly Adjustment Frame (#50) into the Butterfly Support Fra
STEP 10 (See Diagram 10) A.) Attach the Vertical Press Base (#23) to the pivot on the Power Station Vertical Frame (#7). Secure it with one Axle
CABLE LOOP DIAGRAM 18
TABLE OF CONTENTS BEFORE YOU BEGIN... 1 IMPORTANT SAFETY NOT
STEP 11 (See Cable Loop Diagram & Diagram 11) A.) Attach the 102” Upper Cable (#36) to the front opening on the Upper Frame (#8). Attach a Pu
DIAGRAM 11 20
STEP 12 (See Cable Loop Diagram & Diagram 12) A.) Clip one end of the 76” Butterfly Cable (#37) to the slot on the Left Butterfly Adjustment Fr
STEP 13 (See Cable Loop Diagram & Diagram 13) A.) Attach the 146” Lower Cable (#35) to the lower opening on the Leg Developer (#26). Attach a
DIAGRAM 13 23
STEP 14 (See Diagram 14) A.) Attach the 49” Front Press Cable (#38) to the small opening on the Right Vertical Frame (#5). Secure the head of the Ca
STEP 15 (See Diagram 15) A.) Attach a Short Chain (#88) to the open bracket on the Power Station Vertical Frame (#7). Secure it with one M10
DIAGRAM 15 26
STEP 16 (See Diagram 16) A.) Attach the 216” Leg Press Cable (#40) to the bracket on the back of Leg Press Frame (#25). Secure it with one M10 x 1”
STEP 17 (See Diagram 17) A.) Place a Seat Pad (#42) onto the Seat Incline Adjustment Frame (#27). Secure it with two M8 x 1 5/8” Allen Bolts (#104)
IMPORTANT SAFETY NOTICE PRECAUTIONS This exercise machine is built for optimum safety. However, certain precautions apply whenever you operate a p
STEP 18 (See Diagram 18) A.) Attach the Backrest Board (#41) to the Right & Left Vertical Frames (#5 & #6). Secure each Board with two M8 x
PARTS LIST KEY NO. DESCRIPTION Q’ty 1 Right Base Frame 1 2 Left Base Frame 1 3 Power Station Base Frame 1 4 Guide Rod 4 5 Right Vertical Fra
TSA-9900 WEIGHT RESISTANCE CHART WEIGHT PLATE Station 1 2 3 4 5 6 7 Low Pulley 35 45 55 65 75 85 95 Lat Pull 15 25 35 45 55 65 75 Butterfly 10
IMPEX INC. LIMITED WARRANTY IMPEX Inc. ("IMPEX") warrants this product to be free from defects in workmanship and material, under normal
WARNING LABEL REPLACEMENT The warning labels shown here have been placed on the Rear Base and Upper Frame. If the labels are missing or illegible, p
HARDWARE PACK 4
HARDWARE PACK 5
HARDWARE PACK 6
ASSEMBLY INSTRUCTION Tools Required Assembling the Machine: Two Adjustable Wrenches and Allen Wrenches NOTE: It is strongly recommended two or peopl
STEP 2 (See Diagram 2) A.) Attach the Left Base and the Power Station Base Frame (#2 & #3) to the Right Base Frame (#1). B.) Align the
Comments to this Manuals